GLT Product Development
Logistics & SCM

Warehouse Workflow Kiosk: Connecting the Floor with WMS

The scope of task selection, work instructions and result registration, based on 2022 development coverage and GLT materials. Historical development is distinguished from current implementation conditions.

Illustration for Warehouse Workflow Kiosk: Connecting the Floor with WMS
This is a conceptual diagram to explain the work and introduction of the GLT kiosk. Not actual product screens or operational performance.

GLT Korea developed the kiosk as a contact point that connects logistics center workers and the work system. This is a flow in which order and work information from the WMS is delivered to the site, workers check instructions, process picking, inspection, loading, etc., and then register the results.

What is confirmed in the 2022 development report

On November 29, 2022, Maeil Business Newspaper reported that GLT developed a kiosk-based logistics center worker workflow optimization system through the ‘2022 Core Industry Cloud Flagship Project’. The report at the time introduced the connection between cloud-based SaaS and logistics center sites.

development areaWhat is confirmed in the data
Work system connectionDelivery of order and work information from WMS and registration of field work results
operator contact pointSelect a task from the kiosk, confirm instructions and perform the task
field workComposition of work flow such as picking, inspection, loading, etc.
Product introduction materialExample of indoor equipment, instruction printing/barcode processing, WMS/TMS linkage items

Why was an on-site contact point needed?

Even if there is an order in the work system, if the actual worker relies on paper instructions and verbal communication, there is a process of changing instructions and re-entering processing results. This development focused on a structure that allows workers to confirm instructions and link results in the field.

The original introduction material shows the flow of order reception → work type selection → instruction confirmation/output → work result processing. Which tasks field equipment and mobiles will be deployed for should be designed on a center-by-center basis.

Development history and current introduction conditions are distinguished.

This article is a product development history and does not present construction/inspection performance or pre- and post-war productivity improvement figures for a specific customer company. Relieving the investment burden and improving efficiency as reported were the expected effects at the time. It does not represent actual savings, increased throughput or up-to-date certification status.

We do not assume that the cloud, mobile, task allocation, and authentication related items in the existing data will be basic features of all current introductions. Please confirm the provided version and scope of equipment, connection, and operation support during consultation.

To review your current application

You can review field coverage based on center type, representative tasks, existing WMS/TMS, and order/barcode samples. Logistics center work management kiosk functions and work flowand Introduction preparation guideCheck first.

Source

Maeil Business Newspaper and GLT Korea develop a kiosk-based logistics center workflow optimization system (2022.11.29) · Existing GLT product introduction material. It has been reorganized to distinguish between the time of original publication and the current scope of provision.

YOUR OPERATIONS / NEXT STEP

Start by connecting with our center’s representative work.

Please tell me the process by which workers receive instructions and return results. We review the roles of business systems, terminals, printers, and scanners together.

Please choose a situation that is close to our company.

Having these materials will be helpful in your review.

  • Representative tasks and instructions/barcode
  • Currently WMS·TMS
  • Terminal/output equipment and installation environment

Even if you don't have any data yet, you can tell us about your current situation. Information that is difficult to disclose may be reviewed as a sample with identifying information masked.

In consultation, the scope is set as follows.

  1. Check current work and improvement goals
  2. Summary of data/constraints and comparative verification scope
  3. Link to existing systems and discuss scope of construction
Consult on our company’s assignments Apply without registering and select system/size input
REFERENCESView Source / References ↗

Please check the guidance in the text for the scope covered by the material. The date of publication of the original text and the actual performance period are distinguished.

STAY CONNECTED

Stay up to date with logistics.

Cases, product news and implementation guides for your interests. Subscribe with email verification and your consent.

Subscribe to GLT →
LET’S SOLVE IT TOGETHER

What logistics challenge
are you facing?

Talk to GLT ↗