The integrated disaster management resources management system is a national system that supports disaster response by linking the status and movement of resources such as stockpiled materials and equipment. GLT Korea is introducing the history of participation in the intelligent logistics field of a consortium formed by CJ OliveNetworks and others.
What problem is your business solving?
Information on resources divided between institutions and facilities must be connected to each other to find necessary materials and plan movement. Connecting reference information, supply chain, logistics, and field operations is a key task for this business.
Scope of performance introduced by GLT
GLT's existing public portfolio describes integrated logistics management systems and mobile field management systems as its areas of responsibility. On this page, the logistics work is summarized as follows.
| work area | Description |
|---|---|
| WMS · Warehouse management | Management of receipt, release, inventory and storage location of resources by facility |
| TMS · Transportation Management | Linking transport planning, vehicle dispatch and movement status |
| Dispatching Optimization | Allocation and route planning considering resource demand and vehicle and operating conditions |
| Field work connection | Linkage of resource movement and processing information between facility and site |
Release schedule and expected effects
CJ OliveNetworks' press release on September 29, 2021 explains the 24-month construction plan and annual direction of implementation. This schedule is the business plan released at the time and does not refer to the actual inspection date or current operating status of individual modules.
Expected effects include identifying resource status, establishing transportation plans, and supporting on-site decision-making. The extent of input time reduction or cost savings must be evaluated based on operational data and comparative conditions.
What data can I check?
- GLT public portfolio/consortium participation and areas of responsibility
- CJ OliveNetworks press release · Business overview and construction plan at the time
We have separated and linked the introduction of GLT's own performance and the main business operator's business presentation. Quantitative performance and individual inspection results are not presented as definitive figures in this article.