solution material
Resources

G-TO and TMS, October 2025: Implementation and Operations

A 44-slide PowerPoint covering TMS project experience, optimization functions, transport and network simulation, and screenshots of earlier implementations.

Illustration for G-TO and TMS, October 2025: Implementation and Operations
The relationship between TO·NO and TMS can be found in the text. The representative image is the feature description cover of the 2026 introduction.

Original Korean source material. See the English explanation on this page.

This is an introduction to GLT's transportation management and optimization functions and project cases. Based on the file name, it is the October 2025 version and includes past construction screens and data from that time.

Content information

contentslide
performance historyChapters 4-5
Company B network optimizationChapter 19
Optimized TMS and dispatch methodChapters 29-31
Company I simulation/result screenChapters 32-37
Company H pickup and cultivation vehicleChapters 38-41
Feature SummaryChapter 42

When reading material

The price, construction period, map service conditions and past screens in the comparison table do not represent the current confirmed quote or product UI. Check the adoption conditions based on the applicable version, data preparation, and scope of external linkage.

TMS Workflow · TO basic input and results · NO analysis area

YOUR OPERATIONS / NEXT STEP

How do we apply dispatch and replanning to our work?

Please tell us about the most difficult situation in dispatch right now. We review the required data, site constraints, and scope of connection with existing systems.

Please choose a situation that is close to our company.

Having these materials will be helpful in your review.

  • Representative order/vehicle items
  • Operational restrictions such as delivery time and vehicle type
  • Current dispatch method and examples of changes

Even if you don't have any data yet, you can tell us about your current situation. Information that is difficult to disclose may be reviewed as a sample with identifying information masked.

In consultation, the scope is set as follows.

  1. Check current work and improvement goals
  2. Summary of data/constraints and comparative verification scope
  3. Link to existing systems and discuss scope of construction
Consult on our company’s assignments Apply without registering and select system/size input
ATTACHED DOCUMENTGLT_GTO_TMS_Solutions_202510.pptx (Korean original)
Download ↓
STAY CONNECTED

Stay up to date with logistics.

Cases, product news and implementation guides for your interests. Subscribe with email verification and your consent.

Subscribe to GLT →
LET’S SOLVE IT TOGETHER

What logistics challenge
are you facing?

Talk to GLT ↗