solution material
Resources

G-TO Solutions 2026: Transportation and Network Optimization

An 85-page PDF introducing G-TO’s TO, NO, Route and Load Build functions, application architecture and GLT project examples.

Illustration for G-TO Solutions 2026: Transportation and Network Optimization
G-TO Solution Introduction (2026) page 28. This is the function description cover of the introduction material.

Original Korean source material. See the English explanation on this page.

This is an introduction to the 2026 solution provided by GLT. G-TO is referred to as Global Transportation Optimizer in the introduction materials, and both transportation optimization TO and Network Optimization NO are explained together.

Check what you need first

topicPDF page count
Structure/InterfacePages 15-20
Basic optimization featuresPages 28-42
Company B network reorganizationpage 48
Company I vehicle compositionPages 67-69
Company H pickup and cultivation vehiclePages 70-75

Read on website

Scope of application of materials

Attached is the original introduction provided. Because it includes general expected effects, case comparison results, and function/configuration suggestions, it is different from individual customers' latest contract specifications or performance warranties under the same conditions. In the examples on the web page, verifiable conditions and interpretation ranges are summarized.

YOUR OPERATIONS / NEXT STEP

How do we apply dispatch and replanning to our work?

Please tell us about the most difficult situation in dispatch right now. We review the required data, site constraints, and scope of connection with existing systems.

Please choose a situation that is close to our company.

Having these materials will be helpful in your review.

  • Representative order/vehicle items
  • Operational restrictions such as delivery time and vehicle type
  • Current dispatch method and examples of changes

Even if you don't have any data yet, you can tell us about your current situation. Information that is difficult to disclose may be reviewed as a sample with identifying information masked.

In consultation, the scope is set as follows.

  1. Check current work and improvement goals
  2. Summary of data/constraints and comparative verification scope
  3. Link to existing systems and discuss scope of construction
Consult on our company’s assignments Apply without registering and select system/size input
ATTACHED DOCUMENTGLT_GTO_Solutions_2026.pdf (Korean original)
Download ↓
STAY CONNECTED

Stay up to date with logistics.

Cases, product news and implementation guides for your interests. Subscribe with email verification and your consent.

Subscribe to GLT →
LET’S SOLVE IT TOGETHER

What logistics challenge
are you facing?

Talk to GLT ↗