Company H's case is a pick-up service in the metropolitan area where the picker visits homes and collects parcels at a collection point. The GLT introduction material explains the structure of integrating the fixed areas of Gangnam, Seocho, and Songpa, and replanning routes that have not yet been performed when new orders come in.
Customer challenges and scope of application
- Review of overlapping movement of pick-up routes divided into fixed areas
- Routing considering travel distance, operating time, maximum visit destination, and pickup operation time
- Re-planning of existing unfulfilled routes and new orders
- Business connection to route renewals to Picker Mobile
AS-IS·TO-BE comparison of introduction materials
indicators | AS-IS | TO-BE |
|---|---|---|
Total number of stops | 182 | 182 |
Total travel distance (km) | 468.71 | 236.91 |
Total travel time (h) | 35.43 | 23.97 |
The total number of stops (STOPs) is 182. The table is a before-and-after comparison based on the same number of stops, and the total travel distance decreased by approximately 49% from 468.71km to 236.91km, and the total travel time decreased by approximately 32% from 35.43 hours to 23.97 hours. This is a comparison of distance and time values between ASIS and TOBE calculated through the TO engine. This is a comparison result for the relevant case and does not guarantee a savings rate at other sites.
Operation flow and required data
step | Usage Information and Processing |
|---|---|
initial plan | Create a route with closing orders, pickup locations and picker available resources |
change collection | Add/edit orders and collect existing routes that have not been visited yet |
replan | Review route changes considering distance, capacity, operation time, and pick-up time |
field execution | Send route change to mobile and guide to next pick-up location |
Real-time operations require mobile linkage with order and vehicle status. This does not mean that the Transportation Optimization Engine alone automatically provides driver apps or location collection.
Sources and output
2026 Introduction Pages 70-75 · 2025.10 Introduction Pages 38-41. The customer name and performance period are limited to the scope disclosed in the introduction materials.