solution material
Resources

NO Facility and Inventory Analysis: Guide and Reference Materials

The data and outputs needed to assess current costs, facility redesign, candidate sites, RDC volumes and product-level inventory placement.

Illustration for NO Facility and Inventory Analysis: Guide and Reference Materials
Description of Company B's network reorganization in the 2026 introduction. This is not a screen of actual calculation results of inventory placement for each product.

Original Korean source material. See the English explanation on this page.

NO (Network Optimization) is a Network Optimization simulator that compares the location of the facility, the volume in charge, and the storage facility for each product. We look at both the reduction in facility operating costs and the additional transportation costs.

Review data and results

analysisPreparation materialsResults to check
current costQuantity, unit price, facility operating cost, trunk line/delivery costCurrent network cost structure
facility reorganization/candidate siteCenter location/CAPA/add/relocate alternativesChanges in cost and volume allocation
RDC quantityStore in charge, demand by store, RDC CAPAStore transfer and overload/idle capacity
Inventory by productNumber of days of inventory, product volume, storage price, trunk costStorage facility and storage/transportation cost alternatives

Examples and Originals

Company B network reorganization · Company I transportation/facility simulation

Pages 38-41 of the attached PDF explain the concept of adding facilities, regions, and changing networks in NO, page 48 explains the case of Company B, and pages 67-69 explain the analysis of Company I. Inventory placement by product is NO analysis area of ​​product description, and the above case does not mean that all its functions have been verified.

YOUR OPERATIONS / NEXT STEP

How will the change of facility affect our logistics costs and operations?

Please tell us your current facility and any changes you are considering. Compare cost, volume, CAPA and analysis scope together.

Please choose a situation that is close to our company.

Having these materials will be helpful in your review.

  • Summary of facilities, stores and volume
  • Storage, operation, and transportation cost items
  • Candidate facilities and capacity/service conditions

Even if you don't have any data yet, you can tell us about your current situation. Information that is difficult to disclose may be reviewed as a sample with identifying information masked.

In consultation, the scope is set as follows.

  1. Check current work and improvement goals
  2. Summary of data/constraints and comparative verification scope
  3. Link to existing systems and discuss scope of construction
Consult on our company’s assignments Apply without registering and select system/size input
ATTACHED DOCUMENTGLT_GTO_Solutions_2026.pdf (Korean original)
Download ↓
STAY CONNECTED

Stay up to date with logistics.

Cases, product news and implementation guides for your interests. Subscribe with email verification and your consent.

Subscribe to GLT →
LET’S SOLVE IT TOGETHER

What logistics challenge
are you facing?

Talk to GLT ↗